Origin2000/Onyx2 Craylink -
Terrh - 03-17-2020
Anyone know how to configure a rackmount onyx2 system?
I've got a dual rack system with 4 "bricks", 2 compute, 2 graphics. I haven't found much documentation on how to configure the cabling or set up irix to see all the hardware. I doubt it's as simple as "plug and play".
I'd like to start with just getting both of the Origin2000 compute bricks configured as a single system, and then once I've got that working well, I'll add the graphics capabilities.
RE: Origin2000/Onyx2 Craylink -
jan-jaap - 03-17-2020
The two CPU bricks are craylinked into a 16 CPU system. The graphics bricks are linked to the CPU bricks using XIO links.
So first you
link the CPU bricks into a single system, like a single rack dual module Origin 2000. The CPU bricks might be side-by-side, one in each rack.
Then you
connect the graphics modules
Honestly, I would at least browse this manual at least once. The
Site Preparation Guide might be a good one too.